Skip to content
Calcapedia
Print as
Number of problems

In the print window, choose “Save as PDF” as the printer (or print it on paper). Seed 1 rebuilds this exact sheet.

Showing 10 problems, seed 1.

Concrete worksheet

Grades 7–8 · CCSS 7.G.B.6, 8.G.C.9

Solve each problem and show your work. Round answers to 2 decimal places where needed.

  1. Problem 1.
    • Units: Metric (meters, cm, m³)
    • What are you pouring?: Slab or footing
    • Length: 4 m
    • Width: 3 m
    • Thickness (depth): 9 cm
    • Extra for waste and spillage: 8%
    • Ready-mix price per cubic meter (optional): $210
    • Price per 80 lb bag (optional): $5.50
    • Yield of a 40 lb (18 kg) bag: 8.5 L
    • Yield of a 60 lb (27 kg) bag: 12.7 L
    • Yield of an 80 lb (36 kg) bag: 17 L

    Find: Concrete to order

  2. Problem 2.
    • Units: Metric (meters, cm, m³)
    • What are you pouring?: Post holes
    • Number of holes: 5
    • Hole diameter: 22 cm
    • Depth of concrete in each hole: 70 cm
    • Post shape: Square
    • Post width or diameter: 7 cm
    • Extra for waste and spillage: 11%
    • Ready-mix price per cubic meter (optional): $200
    • Price per 80 lb bag (optional): $9
    • Yield of a 40 lb (18 kg) bag: 8.5 L
    • Yield of a 60 lb (27 kg) bag: 12.7 L
    • Yield of an 80 lb (36 kg) bag: 17 L

    Find: Concrete to order

  3. Problem 3.
    • Units: US (feet, inches, yd³)
    • What are you pouring?: Post holes
    • Number of holes: 5
    • Hole diameter: 11 in
    • Depth of concrete in each hole: 36 in
    • Post shape: Square
    • Post width or diameter: 3.4 in
    • Extra for waste and spillage: 10%
    • Ready-mix price per cubic yard (optional): $120
    • Price per 80 lb bag (optional): $5.50
    • Yield of a 40 lb bag: 0.3 ft³
    • Yield of a 60 lb bag: 0.45 ft³
    • Yield of an 80 lb bag: 0.6 ft³

    Find: Concrete to order

  4. Problem 4.
    • Units: US (feet, inches, yd³)
    • What are you pouring?: Round column (tube form)
    • Column diameter: 12 in
    • Height: 4 ft
    • How many: 3
    • Extra for waste and spillage: 9%
    • Ready-mix price per cubic yard (optional): $180
    • Price per 80 lb bag (optional): $9
    • Yield of a 40 lb bag: 0.3 ft³
    • Yield of a 60 lb bag: 0.45 ft³
    • Yield of an 80 lb bag: 0.6 ft³

    Find: Concrete to order

  5. Problem 5.
    • Units: Metric (meters, cm, m³)
    • What are you pouring?: Round column (tube form)
    • Column diameter: 38 cm
    • Height: 1.2 m
    • How many: 1
    • Extra for waste and spillage: 10%
    • Ready-mix price per cubic meter (optional): $190
    • Price per 80 lb bag (optional): $6
    • Yield of a 40 lb (18 kg) bag: 8.5 L
    • Yield of a 60 lb (27 kg) bag: 12.7 L
    • Yield of an 80 lb (36 kg) bag: 17 L

    Find: Concrete to order

  6. Problem 6.
    • Units: US (feet, inches, yd³)
    • What are you pouring?: Slab or footing
    • Length: 12 ft
    • Width: 10 ft
    • Thickness (depth): 4 in
    • Extra for waste and spillage: 9%
    • Ready-mix price per cubic yard (optional): $200
    • Price per 80 lb bag (optional): $5.40
    • Yield of a 40 lb bag: 0.3 ft³
    • Yield of a 60 lb bag: 0.45 ft³
    • Yield of an 80 lb bag: 0.6 ft³

    Find: Concrete to order

  7. Problem 7.
    • Units: US (feet, inches, yd³)
    • What are you pouring?: Hollow tube
    • Outer diameter: 21 in
    • Inner diameter (hollow core): 16 in
    • Height: 3 ft
    • How many: 1
    • Extra for waste and spillage: 10%
    • Ready-mix price per cubic yard (optional): $140
    • Price per 80 lb bag (optional): $5.80
    • Yield of a 40 lb bag: 0.3 ft³
    • Yield of a 60 lb bag: 0.45 ft³
    • Yield of an 80 lb bag: 0.6 ft³

    Find: Concrete to order

  8. Problem 8.
    • Units: Metric (meters, cm, m³)
    • What are you pouring?: Slab or footing
    • Length: 3 m
    • Width: 3 m
    • Thickness (depth): 12 cm
    • Extra for waste and spillage: 10%
    • Ready-mix price per cubic meter (optional): $235
    • Price per 80 lb bag (optional): $6.20
    • Yield of a 40 lb (18 kg) bag: 8.5 L
    • Yield of a 60 lb (27 kg) bag: 12.7 L
    • Yield of an 80 lb (36 kg) bag: 17 L

    Find: Concrete to order

  9. Problem 9.
    • Units: US (feet, inches, yd³)
    • What are you pouring?: Round column (tube form)
    • Column diameter: 15 in
    • Height: 4 ft
    • How many: 1
    • Extra for waste and spillage: 10%
    • Ready-mix price per cubic yard (optional): $200
    • Price per 80 lb bag (optional): $5.50
    • Yield of a 40 lb bag: 0.3 ft³
    • Yield of a 60 lb bag: 0.45 ft³
    • Yield of an 80 lb bag: 0.6 ft³

    Find: Concrete to order

  10. Problem 10.
    • Units: Metric (meters, cm, m³)
    • What are you pouring?: Round column (tube form)
    • Column diameter: 30 cm
    • Height: 1 m
    • How many: 1
    • Extra for waste and spillage: 7%
    • Ready-mix price per cubic meter (optional): $210
    • Price per 80 lb bag (optional): $8
    • Yield of a 40 lb (18 kg) bag: 8.5 L
    • Yield of a 60 lb (27 kg) bag: 12.7 L
    • Yield of an 80 lb (36 kg) bag: 17 L

    Find: Concrete to order

Answer key: Concrete worksheet

  1. 1. Concrete to order: 1.17 m³

    1. Multiply length × width × thickness to get the space the concrete fills. The thickness is converted to m first so all the units match

      4×3×9100=1.08 m³
    2. Add 8% extra, because some concrete is always lost to uneven ground and spills

      1.08×1+0.08=1.1664 m³
    3. 40 lb bags: divide the concrete needed by how much one bag makes, then round up, since you can't buy part of a bag

      1,166.4 L8.5 L=137.2235=rounded up:138
    4. 60 lb bags: divide the concrete needed by how much one bag makes, then round up, since you can't buy part of a bag

      1,166.4 L12.7 L=91.8425=rounded up:92
    5. 80 lb bags: divide the concrete needed by how much one bag makes, then round up, since you can't buy part of a bag

      1,166.4 L17 L=68.6118=rounded up:69
    6. Ready-mix cost: the amount to order × the price per m³ (delivery fees not included)

      1.1664 m³×$210.00=$244.94
    7. Bag cost: the number of 80 lb bags × the price per bag

      69×$5.50=$379.50
  2. 2. Concrete to order: 0.13 m³

    1. Find the area of the hole's round opening: π × (half the diameter)², with the diameter converted to m

      π×(221002)2=0.038013 m²
    2. Find the area the square post takes up: width × width

      (7100)2=0.0049 m²
    3. Concrete only fills the gap around the post, so take the post's area away from the hole's, then multiply by the depth

      (0.038013−0.0049)×70100=0.023179 m³
    4. Multiply by the number of holes for the total

      0.023179×5=0.115896 m³
    5. Add 11% extra, because some concrete is always lost to uneven ground and spills

      0.115896×1+0.11=0.128645 m³
    6. 40 lb bags: divide the concrete needed by how much one bag makes, then round up, since you can't buy part of a bag

      128.645058 L8.5 L=15.1347=rounded up:16
    7. 60 lb bags: divide the concrete needed by how much one bag makes, then round up, since you can't buy part of a bag

      128.645058 L12.7 L=10.1295=rounded up:11
    8. 80 lb bags: divide the concrete needed by how much one bag makes, then round up, since you can't buy part of a bag

      128.645058 L17 L=7.5674=rounded up:8
    9. Ready-mix cost: the amount to order × the price per m³ (delivery fees not included)

      0.128645 m³×$200.00=$25.73
    10. Bag cost: the number of 80 lb bags × the price per bag

      8×$9.00=$72.00
  3. 3. Concrete to order: 0.35 yd³

    1. Find the area of the hole's round opening: π × (half the diameter)², with the diameter converted to ft

      π×(11122)2=0.659953 ft²
    2. Find the area the square post takes up: width × width

      (3.412)2=0.080278 ft²
    3. Concrete only fills the gap around the post, so take the post's area away from the hole's, then multiply by the depth

      (0.659953−0.080278)×3612=1.739025 ft³
    4. Multiply by the number of holes for the total

      1.739025×5=8.695123 ft³
    5. Divide by 27 to get cubic yards, the unit ready-mix is sold in (1 yd³ = 27 ft³)

      8.69512327=0.322042 yd³
    6. Add 10% extra, because some concrete is always lost to uneven ground and spills

      0.322042×1+0.1=0.354246 yd³
    7. 40 lb bags: divide the concrete needed by how much one bag makes, then round up, since you can't buy part of a bag

      9.564635 ft³0.3 ft³=31.8821=rounded up:32
    8. 60 lb bags: divide the concrete needed by how much one bag makes, then round up, since you can't buy part of a bag

      9.564635 ft³0.45 ft³=21.2547=rounded up:22
    9. 80 lb bags: divide the concrete needed by how much one bag makes, then round up, since you can't buy part of a bag

      9.564635 ft³0.6 ft³=15.9411=rounded up:16
    10. Ready-mix cost: the amount to order × the price per yd³ (delivery fees not included)

      0.354246 yd³×$120.00=$42.51
    11. Bag cost: the number of 80 lb bags × the price per bag

      16×$5.50=$88.00
  4. 4. Concrete to order: 0.38 yd³

    1. Find the area of the column's round face: π × (half the diameter)². The diameter is converted to ft first so all the units match

      π×(12122)2=0.785398 ft²
    2. Multiply that area by the height to get the space inside one piece, then by the number of pieces

      0.785398×4×3=9.424778 ft³
    3. Divide by 27 to get cubic yards, the unit ready-mix is sold in (1 yd³ = 27 ft³)

      9.42477827=0.349066 yd³
    4. Add 9% extra, because some concrete is always lost to uneven ground and spills

      0.349066×1+0.09=0.380482 yd³
    5. 40 lb bags: divide the concrete needed by how much one bag makes, then round up, since you can't buy part of a bag

      10.273008 ft³0.3 ft³=34.2434=rounded up:35
    6. 60 lb bags: divide the concrete needed by how much one bag makes, then round up, since you can't buy part of a bag

      10.273008 ft³0.45 ft³=22.8289=rounded up:23
    7. 80 lb bags: divide the concrete needed by how much one bag makes, then round up, since you can't buy part of a bag

      10.273008 ft³0.6 ft³=17.1217=rounded up:18
    8. Ready-mix cost: the amount to order × the price per yd³ (delivery fees not included)

      0.380482 yd³×$180.00=$68.49
    9. Bag cost: the number of 80 lb bags × the price per bag

      18×$9.00=$162.00
  5. 5. Concrete to order: 0.15 m³

    1. Find the area of the column's round face: π × (half the diameter)². The diameter is converted to m first so all the units match

      π×(381002)2=0.113411 m²
    2. Multiply that area by the height to get the space inside one piece, then by the number of pieces

      0.113411×1.2×1=0.136094 m³
    3. Add 10% extra, because some concrete is always lost to uneven ground and spills

      0.136094×1+0.1=0.149703 m³
    4. 40 lb bags: divide the concrete needed by how much one bag makes, then round up, since you can't buy part of a bag

      149.703173 L8.5 L=17.6121=rounded up:18
    5. 60 lb bags: divide the concrete needed by how much one bag makes, then round up, since you can't buy part of a bag

      149.703173 L12.7 L=11.7877=rounded up:12
    6. 80 lb bags: divide the concrete needed by how much one bag makes, then round up, since you can't buy part of a bag

      149.703173 L17 L=8.8061=rounded up:9
    7. Ready-mix cost: the amount to order × the price per m³ (delivery fees not included)

      0.149703 m³×$190.00=$28.44
    8. Bag cost: the number of 80 lb bags × the price per bag

      9×$6.00=$54.00
  6. 6. Concrete to order: 1.61 yd³

    1. Multiply length × width × thickness to get the space the concrete fills. The thickness is converted to ft first so all the units match

      12×10×412=40 ft³
    2. Divide by 27 to get cubic yards, the unit ready-mix is sold in (1 yd³ = 27 ft³)

      4027=1.481481 yd³
    3. Add 9% extra, because some concrete is always lost to uneven ground and spills

      1.481481×1+0.09=1.614815 yd³
    4. 40 lb bags: divide the concrete needed by how much one bag makes, then round up, since you can't buy part of a bag

      43.6 ft³0.3 ft³=145.3333=rounded up:146
    5. 60 lb bags: divide the concrete needed by how much one bag makes, then round up, since you can't buy part of a bag

      43.6 ft³0.45 ft³=96.8889=rounded up:97
    6. 80 lb bags: divide the concrete needed by how much one bag makes, then round up, since you can't buy part of a bag

      43.6 ft³0.6 ft³=72.6667=rounded up:73
    7. Ready-mix cost: the amount to order × the price per yd³ (delivery fees not included)

      1.614815 yd³×$200.00=$322.96
    8. Bag cost: the number of 80 lb bags × the price per bag

      73×$5.40=$394.20
  7. 7. Concrete to order: 0.12 yd³

    1. Find the area of the tube's ring-shaped face: the outer circle minus the empty core, worked out in ft

      π4×(1.752−1.3333332)=1.009018 ft²
    2. Multiply that area by the height to get the space inside one piece, then by the number of pieces

      1.009018×3×1=3.027055 ft³
    3. Divide by 27 to get cubic yards, the unit ready-mix is sold in (1 yd³ = 27 ft³)

      3.02705527=0.112113 yd³
    4. Add 10% extra, because some concrete is always lost to uneven ground and spills

      0.112113×1+0.1=0.123324 yd³
    5. 40 lb bags: divide the concrete needed by how much one bag makes, then round up, since you can't buy part of a bag

      3.329761 ft³0.3 ft³=11.0992=rounded up:12
    6. 60 lb bags: divide the concrete needed by how much one bag makes, then round up, since you can't buy part of a bag

      3.329761 ft³0.45 ft³=7.3995=rounded up:8
    7. 80 lb bags: divide the concrete needed by how much one bag makes, then round up, since you can't buy part of a bag

      3.329761 ft³0.6 ft³=5.5496=rounded up:6
    8. Ready-mix cost: the amount to order × the price per yd³ (delivery fees not included)

      0.123324 yd³×$140.00=$17.27
    9. Bag cost: the number of 80 lb bags × the price per bag

      6×$5.80=$34.80
  8. 8. Concrete to order: 1.19 m³

    1. Multiply length × width × thickness to get the space the concrete fills. The thickness is converted to m first so all the units match

      3×3×12100=1.08 m³
    2. Add 10% extra, because some concrete is always lost to uneven ground and spills

      1.08×1+0.1=1.188 m³
    3. 40 lb bags: divide the concrete needed by how much one bag makes, then round up, since you can't buy part of a bag

      1,188 L8.5 L=139.7647=rounded up:140
    4. 60 lb bags: divide the concrete needed by how much one bag makes, then round up, since you can't buy part of a bag

      1,188 L12.7 L=93.5433=rounded up:94
    5. 80 lb bags: divide the concrete needed by how much one bag makes, then round up, since you can't buy part of a bag

      1,188 L17 L=69.8824=rounded up:70
    6. Ready-mix cost: the amount to order × the price per m³ (delivery fees not included)

      1.188 m³×$235.00=$279.18
    7. Bag cost: the number of 80 lb bags × the price per bag

      70×$6.20=$434.00
  9. 9. Concrete to order: 0.2 yd³

    1. Find the area of the column's round face: π × (half the diameter)². The diameter is converted to ft first so all the units match

      π×(15122)2=1.227185 ft²
    2. Multiply that area by the height to get the space inside one piece, then by the number of pieces

      1.227185×4×1=4.908739 ft³
    3. Divide by 27 to get cubic yards, the unit ready-mix is sold in (1 yd³ = 27 ft³)

      4.90873927=0.181805 yd³
    4. Add 10% extra, because some concrete is always lost to uneven ground and spills

      0.181805×1+0.1=0.199986 yd³
    5. 40 lb bags: divide the concrete needed by how much one bag makes, then round up, since you can't buy part of a bag

      5.399612 ft³0.3 ft³=17.9987=rounded up:18
    6. 60 lb bags: divide the concrete needed by how much one bag makes, then round up, since you can't buy part of a bag

      5.399612 ft³0.45 ft³=11.9991=rounded up:12
    7. 80 lb bags: divide the concrete needed by how much one bag makes, then round up, since you can't buy part of a bag

      5.399612 ft³0.6 ft³=8.9994=rounded up:9
    8. Ready-mix cost: the amount to order × the price per yd³ (delivery fees not included)

      0.199986 yd³×$200.00=$40.00
    9. Bag cost: the number of 80 lb bags × the price per bag

      9×$5.50=$49.50
  10. 10. Concrete to order: 0.08 m³

    1. Find the area of the column's round face: π × (half the diameter)². The diameter is converted to m first so all the units match

      π×(301002)2=0.070686 m²
    2. Multiply that area by the height to get the space inside one piece, then by the number of pieces

      0.070686×1×1=0.070686 m³
    3. Add 7% extra, because some concrete is always lost to uneven ground and spills

      0.070686×1+0.07=0.075634 m³
    4. 40 lb bags: divide the concrete needed by how much one bag makes, then round up, since you can't buy part of a bag

      75.633843 L8.5 L=8.8981=rounded up:9
    5. 60 lb bags: divide the concrete needed by how much one bag makes, then round up, since you can't buy part of a bag

      75.633843 L12.7 L=5.9554=rounded up:6
    6. 80 lb bags: divide the concrete needed by how much one bag makes, then round up, since you can't buy part of a bag

      75.633843 L17 L=4.449=rounded up:5
    7. Ready-mix cost: the amount to order × the price per m³ (delivery fees not included)

      0.075634 m³×$210.00=$15.88
    8. Bag cost: the number of 80 lb bags × the price per bag

      5×$8.00=$40.00