Concrete worksheet
Grades 7–8 · CCSS 7.G.B.6, 8.G.C.9
Calcapedia Solve each problem and show your work. Round answers to 2 decimal places where needed.
- 1.
Problem 1. - Units: Metric (meters, cm, m³)
- What are you pouring?: Slab or footing
- Length: 4 m
- Width: 3 m
- Thickness (depth): 9 cm
- Extra for waste and spillage: 8%
- Ready-mix price per cubic meter (optional): $210
- Price per 80 lb bag (optional): $5.50
- Yield of a 40 lb (18 kg) bag: 8.5 L
- Yield of a 60 lb (27 kg) bag: 12.7 L
- Yield of an 80 lb (36 kg) bag: 17 L
Find: Concrete to order
Answer
- 2.
Problem 2. - Units: Metric (meters, cm, m³)
- What are you pouring?: Post holes
- Number of holes: 5
- Hole diameter: 22 cm
- Depth of concrete in each hole: 70 cm
- Post shape: Square
- Post width or diameter: 7 cm
- Extra for waste and spillage: 11%
- Ready-mix price per cubic meter (optional): $200
- Price per 80 lb bag (optional): $9
- Yield of a 40 lb (18 kg) bag: 8.5 L
- Yield of a 60 lb (27 kg) bag: 12.7 L
- Yield of an 80 lb (36 kg) bag: 17 L
Find: Concrete to order
Answer
- 3.
Problem 3. - Units: US (feet, inches, yd³)
- What are you pouring?: Post holes
- Number of holes: 5
- Hole diameter: 11 in
- Depth of concrete in each hole: 36 in
- Post shape: Square
- Post width or diameter: 3.4 in
- Extra for waste and spillage: 10%
- Ready-mix price per cubic yard (optional): $120
- Price per 80 lb bag (optional): $5.50
- Yield of a 40 lb bag: 0.3 ft³
- Yield of a 60 lb bag: 0.45 ft³
- Yield of an 80 lb bag: 0.6 ft³
Find: Concrete to order
Answer
- 4.
Problem 4. - Units: US (feet, inches, yd³)
- What are you pouring?: Round column (tube form)
- Column diameter: 12 in
- Height: 4 ft
- How many: 3
- Extra for waste and spillage: 9%
- Ready-mix price per cubic yard (optional): $180
- Price per 80 lb bag (optional): $9
- Yield of a 40 lb bag: 0.3 ft³
- Yield of a 60 lb bag: 0.45 ft³
- Yield of an 80 lb bag: 0.6 ft³
Find: Concrete to order
Answer
- 5.
Problem 5. - Units: Metric (meters, cm, m³)
- What are you pouring?: Round column (tube form)
- Column diameter: 38 cm
- Height: 1.2 m
- How many: 1
- Extra for waste and spillage: 10%
- Ready-mix price per cubic meter (optional): $190
- Price per 80 lb bag (optional): $6
- Yield of a 40 lb (18 kg) bag: 8.5 L
- Yield of a 60 lb (27 kg) bag: 12.7 L
- Yield of an 80 lb (36 kg) bag: 17 L
Find: Concrete to order
Answer
- 6.
Problem 6. - Units: US (feet, inches, yd³)
- What are you pouring?: Slab or footing
- Length: 12 ft
- Width: 10 ft
- Thickness (depth): 4 in
- Extra for waste and spillage: 9%
- Ready-mix price per cubic yard (optional): $200
- Price per 80 lb bag (optional): $5.40
- Yield of a 40 lb bag: 0.3 ft³
- Yield of a 60 lb bag: 0.45 ft³
- Yield of an 80 lb bag: 0.6 ft³
Find: Concrete to order
Answer
- 7.
Problem 7. - Units: US (feet, inches, yd³)
- What are you pouring?: Hollow tube
- Outer diameter: 21 in
- Inner diameter (hollow core): 16 in
- Height: 3 ft
- How many: 1
- Extra for waste and spillage: 10%
- Ready-mix price per cubic yard (optional): $140
- Price per 80 lb bag (optional): $5.80
- Yield of a 40 lb bag: 0.3 ft³
- Yield of a 60 lb bag: 0.45 ft³
- Yield of an 80 lb bag: 0.6 ft³
Find: Concrete to order
Answer
- 8.
Problem 8. - Units: Metric (meters, cm, m³)
- What are you pouring?: Slab or footing
- Length: 3 m
- Width: 3 m
- Thickness (depth): 12 cm
- Extra for waste and spillage: 10%
- Ready-mix price per cubic meter (optional): $235
- Price per 80 lb bag (optional): $6.20
- Yield of a 40 lb (18 kg) bag: 8.5 L
- Yield of a 60 lb (27 kg) bag: 12.7 L
- Yield of an 80 lb (36 kg) bag: 17 L
Find: Concrete to order
Answer
- 9.
Problem 9. - Units: US (feet, inches, yd³)
- What are you pouring?: Round column (tube form)
- Column diameter: 15 in
- Height: 4 ft
- How many: 1
- Extra for waste and spillage: 10%
- Ready-mix price per cubic yard (optional): $200
- Price per 80 lb bag (optional): $5.50
- Yield of a 40 lb bag: 0.3 ft³
- Yield of a 60 lb bag: 0.45 ft³
- Yield of an 80 lb bag: 0.6 ft³
Find: Concrete to order
Answer
- 10.
Problem 10. - Units: Metric (meters, cm, m³)
- What are you pouring?: Round column (tube form)
- Column diameter: 30 cm
- Height: 1 m
- How many: 1
- Extra for waste and spillage: 7%
- Ready-mix price per cubic meter (optional): $210
- Price per 80 lb bag (optional): $8
- Yield of a 40 lb (18 kg) bag: 8.5 L
- Yield of a 60 lb (27 kg) bag: 12.7 L
- Yield of an 80 lb (36 kg) bag: 17 L
Find: Concrete to order
Answer
Answer key: Concrete worksheet
Calcapedia 1. Concrete to order: 1.17 m³
Multiply length × width × thickness to get the space the concrete fills. The thickness is converted to m first so all the units match
Add 8% extra, because some concrete is always lost to uneven ground and spills
40 lb bags: divide the concrete needed by how much one bag makes, then round up, since you can't buy part of a bag
60 lb bags: divide the concrete needed by how much one bag makes, then round up, since you can't buy part of a bag
80 lb bags: divide the concrete needed by how much one bag makes, then round up, since you can't buy part of a bag
Ready-mix cost: the amount to order × the price per m³ (delivery fees not included)
Bag cost: the number of 80 lb bags × the price per bag
2. Concrete to order: 0.13 m³
Find the area of the hole's round opening: π × (half the diameter)², with the diameter converted to m
Find the area the square post takes up: width × width
Concrete only fills the gap around the post, so take the post's area away from the hole's, then multiply by the depth
Multiply by the number of holes for the total
Add 11% extra, because some concrete is always lost to uneven ground and spills
40 lb bags: divide the concrete needed by how much one bag makes, then round up, since you can't buy part of a bag
60 lb bags: divide the concrete needed by how much one bag makes, then round up, since you can't buy part of a bag
80 lb bags: divide the concrete needed by how much one bag makes, then round up, since you can't buy part of a bag
Ready-mix cost: the amount to order × the price per m³ (delivery fees not included)
Bag cost: the number of 80 lb bags × the price per bag
3. Concrete to order: 0.35 yd³
Find the area of the hole's round opening: π × (half the diameter)², with the diameter converted to ft
Find the area the square post takes up: width × width
Concrete only fills the gap around the post, so take the post's area away from the hole's, then multiply by the depth
Multiply by the number of holes for the total
Divide by 27 to get cubic yards, the unit ready-mix is sold in (1 yd³ = 27 ft³)
Add 10% extra, because some concrete is always lost to uneven ground and spills
40 lb bags: divide the concrete needed by how much one bag makes, then round up, since you can't buy part of a bag
60 lb bags: divide the concrete needed by how much one bag makes, then round up, since you can't buy part of a bag
80 lb bags: divide the concrete needed by how much one bag makes, then round up, since you can't buy part of a bag
Ready-mix cost: the amount to order × the price per yd³ (delivery fees not included)
Bag cost: the number of 80 lb bags × the price per bag
4. Concrete to order: 0.38 yd³
Find the area of the column's round face: π × (half the diameter)². The diameter is converted to ft first so all the units match
Multiply that area by the height to get the space inside one piece, then by the number of pieces
Divide by 27 to get cubic yards, the unit ready-mix is sold in (1 yd³ = 27 ft³)
Add 9% extra, because some concrete is always lost to uneven ground and spills
40 lb bags: divide the concrete needed by how much one bag makes, then round up, since you can't buy part of a bag
60 lb bags: divide the concrete needed by how much one bag makes, then round up, since you can't buy part of a bag
80 lb bags: divide the concrete needed by how much one bag makes, then round up, since you can't buy part of a bag
Ready-mix cost: the amount to order × the price per yd³ (delivery fees not included)
Bag cost: the number of 80 lb bags × the price per bag
5. Concrete to order: 0.15 m³
Find the area of the column's round face: π × (half the diameter)². The diameter is converted to m first so all the units match
Multiply that area by the height to get the space inside one piece, then by the number of pieces
Add 10% extra, because some concrete is always lost to uneven ground and spills
40 lb bags: divide the concrete needed by how much one bag makes, then round up, since you can't buy part of a bag
60 lb bags: divide the concrete needed by how much one bag makes, then round up, since you can't buy part of a bag
80 lb bags: divide the concrete needed by how much one bag makes, then round up, since you can't buy part of a bag
Ready-mix cost: the amount to order × the price per m³ (delivery fees not included)
Bag cost: the number of 80 lb bags × the price per bag
6. Concrete to order: 1.61 yd³
Multiply length × width × thickness to get the space the concrete fills. The thickness is converted to ft first so all the units match
Divide by 27 to get cubic yards, the unit ready-mix is sold in (1 yd³ = 27 ft³)
Add 9% extra, because some concrete is always lost to uneven ground and spills
40 lb bags: divide the concrete needed by how much one bag makes, then round up, since you can't buy part of a bag
60 lb bags: divide the concrete needed by how much one bag makes, then round up, since you can't buy part of a bag
80 lb bags: divide the concrete needed by how much one bag makes, then round up, since you can't buy part of a bag
Ready-mix cost: the amount to order × the price per yd³ (delivery fees not included)
Bag cost: the number of 80 lb bags × the price per bag
7. Concrete to order: 0.12 yd³
Find the area of the tube's ring-shaped face: the outer circle minus the empty core, worked out in ft
Multiply that area by the height to get the space inside one piece, then by the number of pieces
Divide by 27 to get cubic yards, the unit ready-mix is sold in (1 yd³ = 27 ft³)
Add 10% extra, because some concrete is always lost to uneven ground and spills
40 lb bags: divide the concrete needed by how much one bag makes, then round up, since you can't buy part of a bag
60 lb bags: divide the concrete needed by how much one bag makes, then round up, since you can't buy part of a bag
80 lb bags: divide the concrete needed by how much one bag makes, then round up, since you can't buy part of a bag
Ready-mix cost: the amount to order × the price per yd³ (delivery fees not included)
Bag cost: the number of 80 lb bags × the price per bag
8. Concrete to order: 1.19 m³
Multiply length × width × thickness to get the space the concrete fills. The thickness is converted to m first so all the units match
Add 10% extra, because some concrete is always lost to uneven ground and spills
40 lb bags: divide the concrete needed by how much one bag makes, then round up, since you can't buy part of a bag
60 lb bags: divide the concrete needed by how much one bag makes, then round up, since you can't buy part of a bag
80 lb bags: divide the concrete needed by how much one bag makes, then round up, since you can't buy part of a bag
Ready-mix cost: the amount to order × the price per m³ (delivery fees not included)
Bag cost: the number of 80 lb bags × the price per bag
9. Concrete to order: 0.2 yd³
Find the area of the column's round face: π × (half the diameter)². The diameter is converted to ft first so all the units match
Multiply that area by the height to get the space inside one piece, then by the number of pieces
Divide by 27 to get cubic yards, the unit ready-mix is sold in (1 yd³ = 27 ft³)
Add 10% extra, because some concrete is always lost to uneven ground and spills
40 lb bags: divide the concrete needed by how much one bag makes, then round up, since you can't buy part of a bag
60 lb bags: divide the concrete needed by how much one bag makes, then round up, since you can't buy part of a bag
80 lb bags: divide the concrete needed by how much one bag makes, then round up, since you can't buy part of a bag
Ready-mix cost: the amount to order × the price per yd³ (delivery fees not included)
Bag cost: the number of 80 lb bags × the price per bag
10. Concrete to order: 0.08 m³
Find the area of the column's round face: π × (half the diameter)². The diameter is converted to m first so all the units match
Multiply that area by the height to get the space inside one piece, then by the number of pieces
Add 7% extra, because some concrete is always lost to uneven ground and spills
40 lb bags: divide the concrete needed by how much one bag makes, then round up, since you can't buy part of a bag
60 lb bags: divide the concrete needed by how much one bag makes, then round up, since you can't buy part of a bag
80 lb bags: divide the concrete needed by how much one bag makes, then round up, since you can't buy part of a bag
Ready-mix cost: the amount to order × the price per m³ (delivery fees not included)
Bag cost: the number of 80 lb bags × the price per bag