Skip to content
Calcapedia
Print as
Number of problems

In the print window, choose “Save as PDF” as the printer (or print it on paper). Seed 1 rebuilds this exact sheet.

Showing 10 problems, seed 1.

Paver worksheet

Grades 6–7 · CCSS 6.G.A.2, 6.RP.A.3.d

Solve each problem and show your work. Round answers to 2 decimal places where needed.

  1. Problem 1.
    • Units: Metric (meters, mm, m³, tonnes)
    • Paved area: Length × width
    • Length: 5 m
    • Width: 4 m
    • Paver coverage: Pavers per unit area
    • Pavers per square meter: 42 per m²
    • Extra pavers for cuts and breakage: 7%
    • Base gravel depth: 9 cm
    • Bedding sand depth: 3 cm
    • Extra base and sand for compaction: 10%
    • Base gravel density: 1.6 t/m³
    • Sand density: 1.9 t/m³

    Find: Pavers to buy

  2. Problem 2.
    • Units: US (feet, inches, yd³, tons)
    • Paved area: Length × width
    • Length: 12 ft
    • Width: 8 ft
    • Paver coverage: Paver size
    • Paver length: 9 in
    • Paver width: 5 in
    • Extra pavers for cuts and breakage: 14%
    • Base gravel depth: 3 in
    • Bedding sand depth: 2 in
    • Extra base and sand for compaction: 11%
    • Base gravel density: 2,800 lb/yd³
    • Sand density: 2,600 lb/yd³

    Find: Pavers to buy

  3. Problem 3.
    • Units: Metric (meters, mm, m³, tonnes)
    • Paved area: Length × width
    • Length: 4 m
    • Width: 3 m
    • Paver coverage: Pavers per unit area
    • Pavers per square meter: 42 per m²
    • Extra pavers for cuts and breakage: 8%
    • Base gravel depth: 9 cm
    • Bedding sand depth: 4 cm
    • Extra base and sand for compaction: 9%
    • Base gravel density: 2 t/m³
    • Sand density: 1.4 t/m³

    Find: Pavers to buy

  4. Problem 4.
    • Units: Metric (meters, mm, m³, tonnes)
    • Paved area: Length × width
    • Length: 3 m
    • Width: 4 m
    • Paver coverage: Paver size
    • Paver length: 200 mm
    • Paver width: 75 mm
    • Extra pavers for cuts and breakage: 10%
    • Base gravel depth: 9 cm
    • Bedding sand depth: 3 cm
    • Extra base and sand for compaction: 11%
    • Base gravel density: 1.6 t/m³
    • Sand density: 1.3 t/m³

    Find: Pavers to buy

  5. Problem 5.
    • Units: US (feet, inches, yd³, tons)
    • Paved area: Length × width
    • Length: 14 ft
    • Width: 10 ft
    • Paver coverage: Paver size
    • Paver length: 8 in
    • Paver width: 4 in
    • Extra pavers for cuts and breakage: 10%
    • Base gravel depth: 2 in
    • Bedding sand depth: 1 in
    • Extra base and sand for compaction: 9%
    • Base gravel density: 2,400 lb/yd³
    • Sand density: 2,750 lb/yd³

    Find: Pavers to buy

  6. Problem 6.
    • Units: US (feet, inches, yd³, tons)
    • Paved area: Length × width
    • Length: 11 ft
    • Width: 8 ft
    • Paver coverage: Pavers per unit area
    • Pavers per square foot: 3.3 per ft²
    • Extra pavers for cuts and breakage: 11%
    • Base gravel depth: 5 in
    • Bedding sand depth: 1 in
    • Extra base and sand for compaction: 10%
    • Base gravel density: 2,450 lb/yd³
    • Sand density: 3,000 lb/yd³

    Find: Pavers to buy

  7. Problem 7.
    • Units: US (feet, inches, yd³, tons)
    • Paved area: Known area
    • Area: 110 ft²
    • Paver coverage: Paver size
    • Paver length: 7 in
    • Paver width: 4 in
    • Extra pavers for cuts and breakage: 14%
    • Base gravel depth: 4 in
    • Bedding sand depth: 1 in
    • Extra base and sand for compaction: 8%
    • Base gravel density: 2,200 lb/yd³
    • Sand density: 3,350 lb/yd³

    Find: Pavers to buy

  8. Problem 8.
    • Units: Metric (meters, mm, m³, tonnes)
    • Paved area: Length × width
    • Length: 4 m
    • Width: 3 m
    • Paver coverage: Pavers per unit area
    • Pavers per square meter: 64 per m²
    • Extra pavers for cuts and breakage: 11%
    • Base gravel depth: 13 cm
    • Bedding sand depth: 3 cm
    • Extra base and sand for compaction: 10%
    • Base gravel density: 1.8 t/m³
    • Sand density: 1.3 t/m³

    Find: Pavers to buy

  9. Problem 9.
    • Units: US (feet, inches, yd³, tons)
    • Paved area: Known area
    • Area: 110 ft²
    • Paver coverage: Paver size
    • Paver length: 9 in
    • Paver width: 4 in
    • Extra pavers for cuts and breakage: 11%
    • Base gravel depth: 5 in
    • Bedding sand depth: 1 in
    • Extra base and sand for compaction: 8%
    • Base gravel density: 3,400 lb/yd³
    • Sand density: 2,600 lb/yd³

    Find: Pavers to buy

  10. Problem 10.
    • Units: Metric (meters, mm, m³, tonnes)
    • Paved area: Known area
    • Area: 10 m²
    • Paver coverage: Pavers per unit area
    • Pavers per square meter: 44 per m²
    • Extra pavers for cuts and breakage: 8%
    • Base gravel depth: 9 cm
    • Bedding sand depth: 2 cm
    • Extra base and sand for compaction: 9%
    • Base gravel density: 1.4 t/m³
    • Sand density: 1.6 t/m³

    Find: Pavers to buy

Answer key: Paver worksheet

  1. 1. Pavers to buy: 899 pavers

    1. Multiply length by width to get the area you're paving

      5×4=20 m²
    2. Multiply the area by the pavers in each m² to get the pavers that fill it

      20×42=840
    3. Add 7% extra for cuts and breakage, then round up, since you can only buy whole pavers

      840×1+0.07=898.8=rounded up:899
    4. Base gravel: area × depth (cm ÷ 100 turns it into meters), plus extra because it shrinks when packed down

      20×9100×1+0.1=1.98 m³
    5. Base gravel weight: multiply the volume by how heavy each m³ is (its density)

      1.98×1.6=3.168 t
    6. Bedding sand: area × depth (cm ÷ 100 turns it into meters), plus extra because it shrinks when packed down

      20×3100×1+0.1=0.66 m³
    7. Bedding sand weight: multiply the volume by how heavy each m³ is (its density)

      0.66×1.9=1.254 t
  2. 2. Pavers to buy: 351 pavers

    1. Multiply length by width to get the area you're paving

      12×8=96 ft²
    2. Find how many pavers fit in one ft²: divide the 144 in² in it by the face of one paver (length × width)

      1449×5=3.2 per ft²
    3. Multiply the area by the pavers in each ft² to get the pavers that fill it

      96×3.2=307.2
    4. Add 14% extra for cuts and breakage, then round up, since you can only buy whole pavers

      307.2×1+0.14=350.208=rounded up:351
    5. Base gravel: area × depth (in ÷ 12 turns it into feet), plus extra because it shrinks when packed down. Divide by 27 for cubic yards

      96×312×1+0.1127=0.986667 yd³
    6. Base gravel weight: multiply the volume by how heavy each yd³ is (its density), then divide by 2,000 lb per ton

      0.986667×2,8002,000=1.381333 tons
    7. Bedding sand: area × depth (in ÷ 12 turns it into feet), plus extra because it shrinks when packed down. Divide by 27 for cubic yards

      96×212×1+0.1127=0.657778 yd³
    8. Bedding sand weight: multiply the volume by how heavy each yd³ is (its density), then divide by 2,000 lb per ton

      0.657778×2,6002,000=0.855111 tons
  3. 3. Pavers to buy: 545 pavers

    1. Multiply length by width to get the area you're paving

      4×3=12 m²
    2. Multiply the area by the pavers in each m² to get the pavers that fill it

      12×42=504
    3. Add 8% extra for cuts and breakage, then round up, since you can only buy whole pavers

      504×1+0.08=544.32=rounded up:545
    4. Base gravel: area × depth (cm ÷ 100 turns it into meters), plus extra because it shrinks when packed down

      12×9100×1+0.09=1.1772 m³
    5. Base gravel weight: multiply the volume by how heavy each m³ is (its density)

      1.1772×2=2.3544 t
    6. Bedding sand: area × depth (cm ÷ 100 turns it into meters), plus extra because it shrinks when packed down

      12×4100×1+0.09=0.5232 m³
    7. Bedding sand weight: multiply the volume by how heavy each m³ is (its density)

      0.5232×1.4=0.73248 t
  4. 4. Pavers to buy: 880 pavers

    1. Multiply length by width to get the area you're paving

      3×4=12 m²
    2. Find how many pavers fit in one m²: divide the 1,000,000 mm² in it by the face of one paver (length × width)

      1,000,000200×75=66.666667 per m²
    3. Multiply the area by the pavers in each m² to get the pavers that fill it

      12×66.666667=800
    4. Add 10% extra for cuts and breakage, then round up, since you can only buy whole pavers

      800×1+0.1=880=rounded up:880
    5. Base gravel: area × depth (cm ÷ 100 turns it into meters), plus extra because it shrinks when packed down

      12×9100×1+0.11=1.1988 m³
    6. Base gravel weight: multiply the volume by how heavy each m³ is (its density)

      1.1988×1.6=1.91808 t
    7. Bedding sand: area × depth (cm ÷ 100 turns it into meters), plus extra because it shrinks when packed down

      12×3100×1+0.11=0.3996 m³
    8. Bedding sand weight: multiply the volume by how heavy each m³ is (its density)

      0.3996×1.3=0.51948 t
  5. 5. Pavers to buy: 693 pavers

    1. Multiply length by width to get the area you're paving

      14×10=140 ft²
    2. Find how many pavers fit in one ft²: divide the 144 in² in it by the face of one paver (length × width)

      1448×4=4.5 per ft²
    3. Multiply the area by the pavers in each ft² to get the pavers that fill it

      140×4.5=630
    4. Add 10% extra for cuts and breakage, then round up, since you can only buy whole pavers

      630×1+0.1=693=rounded up:693
    5. Base gravel: area × depth (in ÷ 12 turns it into feet), plus extra because it shrinks when packed down. Divide by 27 for cubic yards

      140×212×1+0.0927=0.941975 yd³
    6. Base gravel weight: multiply the volume by how heavy each yd³ is (its density), then divide by 2,000 lb per ton

      0.941975×2,4002,000=1.13037 tons
    7. Bedding sand: area × depth (in ÷ 12 turns it into feet), plus extra because it shrinks when packed down. Divide by 27 for cubic yards

      140×112×1+0.0927=0.470988 yd³
    8. Bedding sand weight: multiply the volume by how heavy each yd³ is (its density), then divide by 2,000 lb per ton

      0.470988×2,7502,000=0.647608 tons
  6. 6. Pavers to buy: 323 pavers

    1. Multiply length by width to get the area you're paving

      11×8=88 ft²
    2. Multiply the area by the pavers in each ft² to get the pavers that fill it

      88×3.3=290.4
    3. Add 11% extra for cuts and breakage, then round up, since you can only buy whole pavers

      290.4×1+0.11=322.344=rounded up:323
    4. Base gravel: area × depth (in ÷ 12 turns it into feet), plus extra because it shrinks when packed down. Divide by 27 for cubic yards

      88×512×1+0.127=1.493827 yd³
    5. Base gravel weight: multiply the volume by how heavy each yd³ is (its density), then divide by 2,000 lb per ton

      1.493827×2,4502,000=1.829938 tons
    6. Bedding sand: area × depth (in ÷ 12 turns it into feet), plus extra because it shrinks when packed down. Divide by 27 for cubic yards

      88×112×1+0.127=0.298765 yd³
    7. Bedding sand weight: multiply the volume by how heavy each yd³ is (its density), then divide by 2,000 lb per ton

      0.298765×3,0002,000=0.448148 tons
  7. 7. Pavers to buy: 645 pavers

    1. Find how many pavers fit in one ft²: divide the 144 in² in it by the face of one paver (length × width)

      1447×4=5.142857 per ft²
    2. Multiply the area by the pavers in each ft² to get the pavers that fill it

      110×5.142857=565.714286
    3. Add 14% extra for cuts and breakage, then round up, since you can only buy whole pavers

      565.714286×1+0.14=644.9143=rounded up:645
    4. Base gravel: area × depth (in ÷ 12 turns it into feet), plus extra because it shrinks when packed down. Divide by 27 for cubic yards

      110×412×1+0.0827=1.466667 yd³
    5. Base gravel weight: multiply the volume by how heavy each yd³ is (its density), then divide by 2,000 lb per ton

      1.466667×2,2002,000=1.613333 tons
    6. Bedding sand: area × depth (in ÷ 12 turns it into feet), plus extra because it shrinks when packed down. Divide by 27 for cubic yards

      110×112×1+0.0827=0.366667 yd³
    7. Bedding sand weight: multiply the volume by how heavy each yd³ is (its density), then divide by 2,000 lb per ton

      0.366667×3,3502,000=0.614167 tons
  8. 8. Pavers to buy: 853 pavers

    1. Multiply length by width to get the area you're paving

      4×3=12 m²
    2. Multiply the area by the pavers in each m² to get the pavers that fill it

      12×64=768
    3. Add 11% extra for cuts and breakage, then round up, since you can only buy whole pavers

      768×1+0.11=852.48=rounded up:853
    4. Base gravel: area × depth (cm ÷ 100 turns it into meters), plus extra because it shrinks when packed down

      12×13100×1+0.1=1.716 m³
    5. Base gravel weight: multiply the volume by how heavy each m³ is (its density)

      1.716×1.8=3.0888 t
    6. Bedding sand: area × depth (cm ÷ 100 turns it into meters), plus extra because it shrinks when packed down

      12×3100×1+0.1=0.396 m³
    7. Bedding sand weight: multiply the volume by how heavy each m³ is (its density)

      0.396×1.3=0.5148 t
  9. 9. Pavers to buy: 489 pavers

    1. Find how many pavers fit in one ft²: divide the 144 in² in it by the face of one paver (length × width)

      1449×4=4 per ft²
    2. Multiply the area by the pavers in each ft² to get the pavers that fill it

      110×4=440
    3. Add 11% extra for cuts and breakage, then round up, since you can only buy whole pavers

      440×1+0.11=488.4=rounded up:489
    4. Base gravel: area × depth (in ÷ 12 turns it into feet), plus extra because it shrinks when packed down. Divide by 27 for cubic yards

      110×512×1+0.0827=1.833333 yd³
    5. Base gravel weight: multiply the volume by how heavy each yd³ is (its density), then divide by 2,000 lb per ton

      1.833333×3,4002,000=3.116667 tons
    6. Bedding sand: area × depth (in ÷ 12 turns it into feet), plus extra because it shrinks when packed down. Divide by 27 for cubic yards

      110×112×1+0.0827=0.366667 yd³
    7. Bedding sand weight: multiply the volume by how heavy each yd³ is (its density), then divide by 2,000 lb per ton

      0.366667×2,6002,000=0.476667 tons
  10. 10. Pavers to buy: 476 pavers

    1. Multiply the area by the pavers in each m² to get the pavers that fill it

      10×44=440
    2. Add 8% extra for cuts and breakage, then round up, since you can only buy whole pavers

      440×1+0.08=475.2=rounded up:476
    3. Base gravel: area × depth (cm ÷ 100 turns it into meters), plus extra because it shrinks when packed down

      10×9100×1+0.09=0.981 m³
    4. Base gravel weight: multiply the volume by how heavy each m³ is (its density)

      0.981×1.4=1.3734 t
    5. Bedding sand: area × depth (cm ÷ 100 turns it into meters), plus extra because it shrinks when packed down

      10×2100×1+0.09=0.218 m³
    6. Bedding sand weight: multiply the volume by how heavy each m³ is (its density)

      0.218×1.6=0.3488 t