Takt Time worksheet

Grade 6 · CCSS 6.RP.A.3.b

Solve each problem and show your work. Round answers to 2 decimal places where needed.

  1. Problem 1.
    • Shift length: 7 hours
    • Shifts in the period: 1
    • Breaks and planned downtime per shift: 70 min
    • Customer demand in the period: 310 units
    • Current cycle time (optional): 45 s/unit

    Find: Takt time

  2. Problem 2.
    • Shift length: 5 hours
    • Shifts in the period: 1
    • Breaks and planned downtime per shift: 72 min
    • Customer demand in the period: 450 units
    • Current cycle time (optional): 52 s/unit

    Find: Takt time

  3. Problem 3.
    • Shift length: 6 hours
    • Shifts in the period: 1
    • Breaks and planned downtime per shift: 65 min
    • Customer demand in the period: 400 units
    • Current cycle time (optional): 80 s/unit

    Find: Takt time

  4. Problem 4.
    • Shift length: 9 hours
    • Shifts in the period: 2
    • Breaks and planned downtime per shift: 65 min
    • Customer demand in the period: 480 units
    • Current cycle time (optional): 46 s/unit

    Find: Takt time

  5. Problem 5.
    • Shift length: 9 hours
    • Shifts in the period: 2
    • Breaks and planned downtime per shift: 60 min
    • Customer demand in the period: 400 units
    • Current cycle time (optional): 38 s/unit

    Find: Takt time

  6. Problem 6.
    • Shift length: 7 hours
    • Shifts in the period: 1
    • Breaks and planned downtime per shift: 68 min
    • Customer demand in the period: 375 units
    • Current cycle time (optional): 50 s/unit

    Find: Takt time

  7. Problem 7.
    • Shift length: 9 hours
    • Shifts in the period: 1
    • Breaks and planned downtime per shift: 75 min
    • Customer demand in the period: 400 units
    • Current cycle time (optional): 45 s/unit

    Find: Takt time

  8. Problem 8.
    • Shift length: 8 hours
    • Shifts in the period: 1
    • Breaks and planned downtime per shift: 55 min
    • Customer demand in the period: 425 units
    • Current cycle time (optional): 60 s/unit

    Find: Takt time

  9. Problem 9.
    • Shift length: 6 hours
    • Shifts in the period: 1
    • Breaks and planned downtime per shift: 55 min
    • Customer demand in the period: 400 units
    • Current cycle time (optional): 45 s/unit

    Find: Takt time

  10. Problem 10.
    • Shift length: 7 hours
    • Shifts in the period: 1
    • Breaks and planned downtime per shift: 49 min
    • Customer demand in the period: 425 units
    • Current cycle time (optional): 71 s/unit

    Find: Takt time

Answer key: Takt Time worksheet

  1. 1. Takt time: 67.74 s/unit

    1. Turn the shift into minutes and take out breaks, which leaves the time you actually work

      7×60−70=350 min
    2. Multiply by the number of shifts, then by 60, to get all your working time in seconds

      350×1×60=21,000 s
    3. Share that time out over the units ordered. This is takt time, the pace you need to keep

      21,000310=67.741935 s/unit
    4. Compare your cycle time with takt as a percent. 100% or less means you keep up with demand

      4567.741935×100=66.43%
    5. See how many units you could make at your current pace by dividing your working time by the cycle time

      21,00045=466.67 units
  2. 2. Takt time: 30.4 s/unit

    1. Turn the shift into minutes and take out breaks, which leaves the time you actually work

      5×60−72=228 min
    2. Multiply by the number of shifts, then by 60, to get all your working time in seconds

      228×1×60=13,680 s
    3. Share that time out over the units ordered. This is takt time, the pace you need to keep

      13,680450=30.4 s/unit
    4. Compare your cycle time with takt as a percent. 100% or less means you keep up with demand

      5230.4×100=171.05%
    5. See how many units you could make at your current pace by dividing your working time by the cycle time

      13,68052=263.08 units
  3. 3. Takt time: 44.25 s/unit

    1. Turn the shift into minutes and take out breaks, which leaves the time you actually work

      6×60−65=295 min
    2. Multiply by the number of shifts, then by 60, to get all your working time in seconds

      295×1×60=17,700 s
    3. Share that time out over the units ordered. This is takt time, the pace you need to keep

      17,700400=44.25 s/unit
    4. Compare your cycle time with takt as a percent. 100% or less means you keep up with demand

      8044.25×100=180.79%
    5. See how many units you could make at your current pace by dividing your working time by the cycle time

      17,70080=221.25 units
  4. 4. Takt time: 118.75 s/unit

    1. Turn the shift into minutes and take out breaks, which leaves the time you actually work

      9×60−65=475 min
    2. Multiply by the number of shifts, then by 60, to get all your working time in seconds

      475×2×60=57,000 s
    3. Share that time out over the units ordered. This is takt time, the pace you need to keep

      57,000480=118.75 s/unit
    4. Compare your cycle time with takt as a percent. 100% or less means you keep up with demand

      46118.75×100=38.74%
    5. See how many units you could make at your current pace by dividing your working time by the cycle time

      57,00046=1,239.13 units
  5. 5. Takt time: 144 s/unit

    1. Turn the shift into minutes and take out breaks, which leaves the time you actually work

      9×60−60=480 min
    2. Multiply by the number of shifts, then by 60, to get all your working time in seconds

      480×2×60=57,600 s
    3. Share that time out over the units ordered. This is takt time, the pace you need to keep

      57,600400=144 s/unit
    4. Compare your cycle time with takt as a percent. 100% or less means you keep up with demand

      38144×100=26.39%
    5. See how many units you could make at your current pace by dividing your working time by the cycle time

      57,60038=1,515.79 units
  6. 6. Takt time: 56.32 s/unit

    1. Turn the shift into minutes and take out breaks, which leaves the time you actually work

      7×60−68=352 min
    2. Multiply by the number of shifts, then by 60, to get all your working time in seconds

      352×1×60=21,120 s
    3. Share that time out over the units ordered. This is takt time, the pace you need to keep

      21,120375=56.32 s/unit
    4. Compare your cycle time with takt as a percent. 100% or less means you keep up with demand

      5056.32×100=88.78%
    5. See how many units you could make at your current pace by dividing your working time by the cycle time

      21,12050=422.4 units
  7. 7. Takt time: 69.75 s/unit

    1. Turn the shift into minutes and take out breaks, which leaves the time you actually work

      9×60−75=465 min
    2. Multiply by the number of shifts, then by 60, to get all your working time in seconds

      465×1×60=27,900 s
    3. Share that time out over the units ordered. This is takt time, the pace you need to keep

      27,900400=69.75 s/unit
    4. Compare your cycle time with takt as a percent. 100% or less means you keep up with demand

      4569.75×100=64.52%
    5. See how many units you could make at your current pace by dividing your working time by the cycle time

      27,90045=620 units
  8. 8. Takt time: 60 s/unit

    1. Turn the shift into minutes and take out breaks, which leaves the time you actually work

      8×60−55=425 min
    2. Multiply by the number of shifts, then by 60, to get all your working time in seconds

      425×1×60=25,500 s
    3. Share that time out over the units ordered. This is takt time, the pace you need to keep

      25,500425=60 s/unit
    4. Compare your cycle time with takt as a percent. 100% or less means you keep up with demand

      6060×100=100%
    5. See how many units you could make at your current pace by dividing your working time by the cycle time

      25,50060=425 units
  9. 9. Takt time: 45.75 s/unit

    1. Turn the shift into minutes and take out breaks, which leaves the time you actually work

      6×60−55=305 min
    2. Multiply by the number of shifts, then by 60, to get all your working time in seconds

      305×1×60=18,300 s
    3. Share that time out over the units ordered. This is takt time, the pace you need to keep

      18,300400=45.75 s/unit
    4. Compare your cycle time with takt as a percent. 100% or less means you keep up with demand

      4545.75×100=98.36%
    5. See how many units you could make at your current pace by dividing your working time by the cycle time

      18,30045=406.67 units
  10. 10. Takt time: 52.38 s/unit

    1. Turn the shift into minutes and take out breaks, which leaves the time you actually work

      7×60−49=371 min
    2. Multiply by the number of shifts, then by 60, to get all your working time in seconds

      371×1×60=22,260 s
    3. Share that time out over the units ordered. This is takt time, the pace you need to keep

      22,260425=52.376471 s/unit
    4. Compare your cycle time with takt as a percent. 100% or less means you keep up with demand

      7152.376471×100=135.56%
    5. See how many units you could make at your current pace by dividing your working time by the cycle time

      22,26071=313.52 units